The first roof installation at the sports complex «ARENA» OMSK

23.07.2021

The first metal roof structure was installed at the construction site of the Arena-Omsk multifunctional sports complex.

A metal truss with support hinges is installed at a height of 32 meters. The weight of the structure is 96 tons, the length is 90 meters. Two multi-ton cranes were assembled specially for the installation of the roof at the construction site.

A total of 14 metal trusses of various sizes will be installed, taking into account the arched roof of the Arena. The average weight of each structure is about 100 tons. Length from 90 to 97 meters.