Construction of the new passenger terminal of domestic airlines continues on the territory of Voronezh International Airport. The general contractor, LMS Group, starts concreting the floor slab of the second floor at +5.250.
The laying of the foundation of the building is fully completed. The builders have performed monolithic work in the volume of 4 300 m3. The vertical structures of the 1st floor are completely finished, including the walls, the bulkheads, the elevator shafts and the stairways. In the basement the insulation and the installation of the internal drainage system is completed.
LMS specialists continue erecting the formwork and reinforcing the floor slab at +5.250. The site is also being excavated for the construction of the storm water treatment facilities (STF). The volume of excavated soil amounted to 1,000 m3.
The general contractor is carrying out all construction works in accordance with the approved plans and labor legislation of Russian Federation. The scope of work at the site in the first half of October is presented in our time-lapse video.